ProvinceNewfoundland and Labrador

What are you about to say yes to? › Land and buildings › Newfoundland and Labrador

Land and buildings · Newfoundland and Labrador

Buying land or a cottage in Newfoundland and Labrador

Before you buy land, a cottage lot or a rural home in Newfoundland and Labrador: the Crown's strip along the shore, permits for work near water, title to land held without a deed, the well and the septic system, and building along a provincial highway, from the Acts and the Province's pages.

16 official pages, each read 20 November 2026

The answer to the card picked above, with its drawing and official pages. A full page opens in a new tab.

  1. Land on a lake, a river or the sea?

    15 m strip along the water stays Crown land when a Crown grant, lease or licence doesn't expressly include itSource: Lands Act, s. 7
    The shore strip, kept by the Crown

    Newfoundland and Labrador

    15 m strip of Crown land, at least, around a lake or pond and along the seashore or each bank of a river, doesn't pass with a Crown grant, lease, licence or quitclaim that doesn't expressly include it
    • The Minister may grant the strip for a commercial or industrial undertaking or for aquaculture, or the part a home built before 1 April 1992 sits on, and may license it for a boathouse, wharf, slipway or trail.
    • A grant of the strip, or a licence on it, carries no exclusive hunting or fishing rights.
    • The water itself, and the right to use and divert it, belongs to the Crown; no one acquires a right to it by long use.

    House of Assembly of Newfoundland and Labrador, consolidated statutes: Lands Act, chapter 36 of 1991 (current to 7 July 2026) · House of Assembly of Newfoundland and Labrador, consolidated statutes: Water Resources Act, chapter W-4.01 (current to 7 July 2026). Read 20 November 2026.

  2. A wharf, a culvert or a boathouse?

    Permit from the Province first, for any work in water or a wetland or within 15 m of the high water markSource: Water Resources Act, s. 48 permits
    The permit, the time and the flood zones

    Newfoundland and Labrador

    The Province's permit to alter a body of water, under section 48 of the Water Resources Act:

    • Near the water 15 m

      of the high water mark: any work there, any work in the water or a wetland, and infilling within 15 m of a wetland, needs the permit before it starts.

    • On the shore Permit

      for a wharf, boathouse, slipway or breakwater, for storm drainage into a body of water, and for work in a floodplain or the shore water zone.

    • The wait 4–6weeks

      the standard processing time, once every document and approval needed is in.

    • Flood zones 1 in 20

      years marks the floodway on the Province's flood hazard maps, and 1 in 100 the flood fringe, mapped for a list of communities.

    • An application for work in Labrador goes first to the Office of Indigenous Relations and Reconciliation, which decides whether consultation is needed.
    • The Minister may designate flood risk areas, regulate building in them and require flood proofing for property to be developed there.
    • The Province is updating its flood maps with climate change projections; its mapping application is for information, and the studies themselves are the authoritative source.

    Government of Newfoundland and Labrador, Water Resources Management Division: Permit and License Applications (updated 14 October 2026) · Government of Newfoundland and Labrador, Water Resources Management Division: Flood Risk Mapping (updated 21 August 2026) · House of Assembly of Newfoundland and Labrador, consolidated statutes: Water Resources Act, chapter W-4.01 (current to 7 July 2026). Read 20 November 2026.

  3. Land held without a deed?

    2029 10 December: the last day the Province takes applications for title to Crown land held since before 1977Source: Crown Lands, adverse possession
    Squatter's rights, and their end date

    Newfoundland and Labrador

    1977 is the line: no possession of Crown land after 31 December 1976 counts toward title, while 10 continuous years of open use just before 1 January 1977 can support a Crown grant or a quitclaim
    • The Lands Act bars such a claim more than five years after that limit took effect, in December 2024.
    • The Province's page says it takes no applications based on adverse possession after 10 December 2029; two people outside the family who have known the property since at least 1 January 1967 support each application.
    • Once an application is approved, the land is surveyed within 12 months by a registered member of the Association of Newfoundland Land Surveyors, at the applicant's cost.
    • A year-round primary residence held on 15 October 2024 in a municipality or local service district may get a quitclaim under the Primary Residence Land Title Program, usually on a lot of up to 1,860 m², also until 10 December 2029; a quitclaim passes whatever interest the Crown has, without ruling out anyone else's.

    House of Assembly of Newfoundland and Labrador, consolidated statutes: Lands Act, chapter 36 of 1991 (current to 7 July 2026) · Government of Newfoundland and Labrador, Department of Forestry, Agriculture and Lands: Adverse Possession (squatter's rights) (updated 4 June 2026) · Government of Newfoundland and Labrador, Department of Forestry, Agriculture and Lands: Primary Residence Land Title Program (updated 20 August 2026). Read 20 November 2026.

  4. A well and a septic system

    No town water or sewer? 1,860 square metres at least for a lot with its own well and septic system, both approved by the ProvinceSource: Private Sewage Disposal and Water Supply StandardsA drilled well? 16 m at least from a septic tank, a tile sewer or an absorption field, and 30 m from a cesspoolSource: Well Drilling Regulations, 2003, s. 9
    The approval, the lot and the distances

    Newfoundland and Labrador

    On a lot with no town water or sewer:

    • The approval Approved

      for the installation of its sewage system and well, from plans by an Approved Designer sent to the Government Service Centre; there's no fee.

    • The lot 1,860m²

      at least, 30 m wide where the absorption field goes; 1,400 m² and 23 m with town water or sewer for one of the two.

    • The distances 16 m

      at least between a drilled well and a septic tank, a tile sewer or an absorption field, and 30 m from a cesspool.

    • The driller Licensed

      drillers alone carry on the business of drilling wells, and report a well's tests to the Province within 30 days.

    • The Province's fact sheet for buyers and sellers lists the well system, checked by a licensed driller, the well record, the yield and a test of the water for chemistry and bacteria; the Water Resources Management Division holds most well records.
    • Government Service Centres hand out free groundwater chemistry test kits, for iron, manganese, sodium, arsenic, uranium, lead and selenium among others, and the Groundwater Section sends a well's construction record on request.
    • A dug well or a spring is kept 30 m from a septic tank or an absorption field, and surface water 30 m as well.

    Government of Newfoundland and Labrador, Department of Government Services, Government Service Centre: Less Than 4546 L Per Day and Well Approval (updated 6 May 2026) · Government of Newfoundland and Labrador, Department of Government Services: Private Sewage Disposal and Water Supply Standards (published 19 November 2009) · House of Assembly of Newfoundland and Labrador, consolidated regulations: Well Drilling Regulations, 2003, NLR 63/03 (current to 7 July 2026) · Government of Newfoundland and Labrador, Water Resources Management Division: Buying or Selling Property That Has a Water Well (published 4 February 2026) · Government of Newfoundland and Labrador, Water Resources Management Division: Groundwater Wells: What You Need to Know (updated 3 February 2026). Read 20 November 2026.

  5. Building along a provincial highway?

    $50 for a residential application to build an access onto a highway classed as a protected road, $500 for a commercial one
    The protected road and its permit

    Newfoundland and Labrador

    $50 for a residential application to build an access onto a highway classed as a protected road, $500 for a commercial one
    • Building on land, Crown or private, within the building control lines of a protected road or inside a protected area needs a development permit first, and an extension or an accessory building there needs the Province's approval too.
    • The access needs the prior approval of the Department of Transportation and Infrastructure or the Government Service Centre, with a location plan.

    Government of Newfoundland and Labrador, Department of Government Services, Government Service Centre: Access to Highway (updated 24 March 2025) · Government of Newfoundland and Labrador, Department of Government Services, Government Service Centre: Land Development (updated 2 June 2025). Read 20 November 2026.

  6. The registers to check

    5 registers: The Land Use Atlas, The Registry of Deeds, Licensed well drillers, Approved Designers, The Flood Hazard Mapping Application
    The Crown's land, the title, the well and the flood maps
    • Crown landThe Land Use AtlasGovernment of Newfoundland and Labrador, Department of Forestry, Agriculture and Lands (updated 13 March 2026)

      Crown land titles and applications, municipal plans and land use limits on a map; the applications it shows may not be current.

      No fee shown
    • The titleThe Registry of DeedsGovernment of Newfoundland and Labrador, Department of Government Services, Registry of Deeds (updated 17 April 2023)

      The deeds registered for the land, online for 1982 on and on paper before.

      $5 a search online
    • A well drillerLicensed well drillersGovernment of Newfoundland and Labrador, Water Resources Management Division (updated 4 March 2026)

      Each driller's licence number and the status of the licence for the year.

      Free
    • A septic systemApproved DesignersGovernment of Newfoundland and Labrador, Department of Government Services, Government Service Centre (updated 6 May 2026)

      The Province's list of the designers who prepare a lot's septic and well plans for approval.

      Free
    • FloodingThe Flood Hazard Mapping ApplicationGovernment of Newfoundland and Labrador, Water Resources Management Division (updated 21 August 2026)

      The 1 in 20 and 1 in 100 year flood zones from the Province's studies, and climate change zones where mapped.

      No fee shown

    Each register's page above read 20 November 2026.

What to re-check, and when

The rules on this page change on these dates or schedules; the official page is the one to read again then.

  • 10 December 2029 The last day the Province's pages give for applications based on adverse possession and under the Primary Residence Land Title Program. Government of Newfoundland and Labrador, Department of Forestry, Agriculture and Lands: Adverse Possession (squatter's rights)
  • As new flood studies are published The flood hazard maps, which the Province is updating with climate change projections. Government of Newfoundland and Labrador, Water Resources Management Division: Flood Risk Mapping
  • When the Lands Act changes The 15 m shoreline strip and the adverse possession rules, in the Act as consolidated to 7 July 2026; parts of its 2024 amendment start on proclamation. House of Assembly of Newfoundland and Labrador, consolidated statutes: Lands Act, chapter 36 of 1991

For businesses

Own a business? Reach the people reading this page.

Reading nowBuying land or a cottage in Newfoundland and Labrador

Matched to this page
  • Land surveyors
  • Well water testing
  • Septic inspection and pumping

Your ad can sit in this space, in view beside the page while they read. From $14.99 for 90 days, paid once.

Advertise here

More on OfferDue

Official pages: each linked under its section above. Each page read 20 November 2026. Free to check yourself; each link opens the official page.

Public-record information, not legal advice. Each line says what the official page shows and links it; rules change, so the official page is the one to rely on. About OfferDue.