What are you about to say yes to? › Contractors and home services › British Columbia › Before you dig
Contractors and home services · British Columbia
Locating buried lines before you dig in British Columbia
The BC Energy Regulator says British Columbia's regulations require anyone digging, from a large excavation to a fence post, to click or call BC 1 Call at least three working days ahead, and work within 30 m of a pipeline it regulates follows the Pipeline Crossings Regulation.
1 official pages, each read 17 November 2026 or since
The answers, 1 on this page. Each opens with its drawing and official pages.
Before you dig
The BC Energy Regulator says British Columbia's regulations require anyone digging, from a large excavation to a fence post, to click or call BC 1 Call at least three working days ahead, and work within 30 m of a pipeline it regulates follows the Pipeline Crossings Regulation.The call, the marks, the pipeline's 30 metres British Columbia
- Ahead of digging
3working days
at least, to click or call BC 1 Call and learn where pipelines lie; then mark them with what its members send, and expose them carefully.
- Near a pipeline
30m
within which a ground activity goes ahead only as the Pipeline Crossings Regulation allows; BC 1 Call confirms whether one or more pipelines lie that close.
- Closer still
10m
each pipeline owner must establish that its line is at least this far away; closer, the owner may give written permission with the rules to follow, and the Regulator may approve the activity.
- Shallow work
30cm
a disturbance less deep than this, or cultivation less than 45 cm deep, isn't a ground activity and needs no call; the Energy Resource Activities Act, s. 76 (1) (b), defines ground activities.
- If a pipeline is hit, the Regulator's flyer says to stop work at once and notify the pipeline's owner.
- A right of way over buried pipelines averages about 18 m wide, may hold more than one line, and a line may not run down its middle or lie at one depth.
- These rules apply to the pipelines the BC Energy Regulator regulates; the flyer points to the Energy Resource Activities Act and the Pipeline Crossings Regulation for the exact requirements.
BC Energy Regulator: Prevent pipeline damage in B.C. (current as of December 2024, read 24 November 2026). Read 17 November 2026 unless dated beside its page.
- Ahead of digging
3working days
For businesses
Own a business? Reach the people reading this page.
Reading nowLocating buried lines before you dig in British Columbia
- General contractors and renovators
- Architects
- Building designers (BCIN)
- +2 more
Your ad can sit in this space, in view beside the page while they read. From $14.99 for 90 days, paid once.
Advertise hereMore on OfferDue
- Hiring a contractor in British ColumbiaNo door sales of furnaces, heat pumps or solar since 1 August 2026, and 10 days to cancel a sale signed at home.
- Every kind of offer in British ColumbiaEach kind with the province's own rules, limits and registers.
- Contractors and home services: the page for every provinceFederal rules, Ontario's and other provinces', with the full file free by email.
Official pages: each linked under its section above. Each page read 17 November 2026, unless its line says otherwise. Free to check yourself; each link opens the official page.
Public-record information, not legal advice. Each line says what the official page shows and links it; rules change, so the official page is the one to rely on. About OfferDue.