ProvinceNew Brunswick

What are you about to say yes to? › Contractors and home services › New Brunswick › Before you dig

Contractors and home services · New Brunswick

Locating buried lines before you dig in New Brunswick

New Brunswick's Pipeline Act has anyone about to disturb the ground find out whether a pipeline is there and tell its operator first, the Energy and Utilities Board's guidelines ask for a locate three working days ahead, and an employer has buried utility lines located before any excavation.

4 official pages, each read 19 November 2026 or since

The answers, 1 on this page. Each opens with its drawing and official pages.

  1. Before you dig

    New Brunswick's Pipeline Act has anyone about to disturb the ground find out whether a pipeline is there and tell its operator first, the Energy and Utilities Board's guidelines ask for a locate three working days ahead, and an employer has buried utility lines located before any excavation.
    The request, the marks, then the shovel

    New Brunswick

    The Pipeline Act, 2005, the Board's guidelines for digging near pipelines and the workplace health and safety regulation, in our words:

    • The law Ask first

      anyone about to excavate, dig, trench, plough, drill, auger, backfill, blast, strip topsoil, level, clear or grade takes every reasonable step to learn whether a pipeline is there and who operates it, and tells the operator what is planned and when; the operator gives what its records show (Pipeline Act, 2005, ss. 1 and 29 (1) to (3)).

    • How far ahead 3working days

      or 72 hours, at least, is how early the Board's guidelines ask for a locate request, except in an emergency; the pipeline operator tries to mark the line, or give an all clear with a reference number, within the same time.

    • Near the marks 1metre

      either side of the marked centre line is how accurate a locate is taken to be; inside those limits no machine digs until test holes have found the pipe's centre line and depth, and none digs within 0.3 metres of the pipe.

    • On a job site 600mm

      before an excavation or trench, an employer has the location of every buried utility line or pipe found; for work within 600 mm of one, the operator is told, the line is de-energized and an adequate procedure is used (Regulation 91-191, s. 180).

    • Contact that punctures, cracks, scratches, gouges, dents or flattens a pipeline, or damages its coating, stops the work at once, and the operator is told where and what; work starts again only with the operator's approval or, failing that, the Board's (s. 29 (4) and (5)).
    • Skipping the check or the notice, or not stopping after contact, is a category H offence, and for an offence that goes on, the lowest and highest fines are multiplied by the number of days (s. 76 and Schedule A).
    • A category H offence carries a fine of $500 to $20,500 (Provincial Offences Procedure Act, s. 56 (8)).
    • The guidelines name Click Before You Dig as the place to ask, and call for a new locate when the marks fade, the work goes past the marked area or beyond the locate's stated period, or the contractor who asked leaves the site.
    • If gas or oil escapes, the guidelines have the equipment shut off, every source of ignition put out, the area barricaded and people kept away, and the fire department, the police and the operator called.

    Government of New Brunswick, Acts and Regulations: Pipeline Act, 2005, chapter P-8.5 (sections 1, 29 and 76, Schedule A) (consolidated to 6 June 2025, read 24 November 2026) · New Brunswick Energy and Utilities Board: Guidelines for Excavations in the Vicinity of Pipelines (published November 2018, read 24 November 2026) · Government of New Brunswick, Acts and Regulations: General Regulation 91-191 under the Occupational Health and Safety Act (section 180) (consolidated to 30 June 2026, read 24 November 2026) · Government of New Brunswick, Acts and Regulations: Provincial Offences Procedure Act, SNB 1987, c. P-22.1 (current to 1 January 2024). Read 19 November 2026 unless dated beside its page.

For businesses

Own a business? Reach the people reading this page.

Reading nowLocating buried lines before you dig in New Brunswick

Matched to this page
  • General contractors and renovators
  • Architects
  • Building designers (BCIN)
  • +2 more

Your ad can sit in this space, in view beside the page while they read. From $14.99 for 90 days, paid once.

Advertise here

More on OfferDue

Official pages: each linked under its section above. Each page read 19 November 2026, unless its line says otherwise. Free to check yourself; each link opens the official page.

Public-record information, not legal advice. Each line says what the official page shows and links it; rules change, so the official page is the one to rely on. About OfferDue.